Vol. 01
Rough-In Standards
Low-voltage rough-in coordination. Cable management, plate locations, conduit, and the trade handoffs that decide whether a project finishes clean.
Resources · Standards Library
Restrepo Innovations authors a working library of installation standards for architects, builders, electricians, owners reps, and our fellow integrators. Eighteen documents in three formats: full field manuals, single-sheet on-site one-pagers, and deep pre-wall detail standards. Use them on Restrepo projects. Use them on yours. Trade-share encouraged. Rebrand or resale prohibited.
01 · Field Manuals
Long-form field manuals authored by Restrepo Innovations. Each document is the working specification for one phase of a luxury residential or commercial project. Read once cover-to-cover. Reference at every milestone.
Vol. 01
Low-voltage rough-in coordination. Cable management, plate locations, conduit, and the trade handoffs that decide whether a project finishes clean.
Vol. 02
Coordination between Restrepo and the electrical trade. Line-voltage and low-voltage interfaces, panel feeds, switching loads, and clean separation of disciplines.
Vol. 03
Pre-wall and substrate cut-line standards for flush-mounted devices. Touch panels, keypads, and architectural trim that sit clean to the finish surface.
Vol. 04
Finish-phase trim-out for touch panels, keypads, and thermostats. Sequencing, paint coordination, and the small details that decide how a wall reads.
Vol. 05
Channel reveal, mud-in, and drywall coordination for architectural linear lighting. The handoffs between integrator, framer, and finisher that produce a clean line.
Vol. 06
Motorized shade pocket, reveal, and bezel standards. Architecture-first window treatments coordinated with framing, drywall, and finish carpentry.
Vol. 07
Pre-wall and pre-ceiling standards for invisible-speaker integration. Substrate, cure schedule, skim coat, and the coordination that makes audio disappear into the architecture.
02 · One-Pagers
Single-sheet condensed versions of the field manuals. Designed to be handed directly to a framer, electrician, drywaller, or finish carpenter at the moment of decision.
Field Card
Single-sheet field card for rough-in coordination. Designed to print, laminate, and pin to the job site.
Field Card
The flush-mount cut-line and substrate standard, condensed to one page for the field.
Field Card
Trim-out sequencing and paint-handoff card. One sheet, on-site reference.
Field Card
The reveal-and-mud-in card. Hand it to the framer and the drywaller before they start.
Field Card
Pocket, reveal, and bezel quick reference for motorized shades. Designed for the framer and finish carpenter.
Field Card
Pre-wall preparation and substrate handoff card for invisible speakers. Single-sheet, field-ready.
03 · Pre-Wall Standards
Bezel geometry. Pocket-reveal depth. Substrate cut-lines. Cure-cone schedules. Channel reveals. The dimension-and-tolerance documents that turn a clean architectural detail from a guess into a spec.
Pre-Wall Detail
The architectural bezel detail for invisible-speaker and panel pre-wall integration. Substrate, dimension, and tolerance specification.
Pre-Wall Detail
Pocket-reveal geometry, depth, and substrate handoff for shades, linear lighting, and integrated AV. Tolerances called out.
Pre-Wall Detail
The cut-line standard for any pre-wall integration. Depth, alignment, kerf, and substrate handoff.
Pre-Wall Detail
Cure-schedule and substrate-prep standard for invisible-speaker integration. Skim-coat and finish handoff.
Pre-Wall Detail
The architectural channel reveal for linear lighting and integrated trim. Reveal width, depth, and finish coordination.
04 · One-Pagers
One-page condensed references for each system type. Hand them to the framer, landscape contractor, or electrician at the moment of decision.
Field Card
Single-page pre-wire reference for AI conference room infrastructure: codec placement, network requirements, display positions, and mic field coverage.
Field Card
Quick-reference for gate operator conduit, intercom mounting heights, access reader positions, and trade coordination for entry automation.
Field Card
Single-page reference for energy monitoring pre-wire: CT placement, sub-meter locations, panel coordination, and data network requirements.
Field Card
Pre-wire reference for motorized shading pockets, exterior sensor positions, conduit sleeves through frames, and weatherproofing at envelope openings.
Field Card
Quick-reference for EV charger circuits, conduit stub-up positions, garage door operator wiring, and network requirements for smart chargers.
Field Card
Pre-wire reference for outdoor speaker stub-ups, burial depths, IP enclosure ratings, and conduit requirements before hardscape installation.
Field Card
Single-page reference for underwater speaker conduit, bonding tie-in points, equipment room wiring, and control integration for pool and spa systems.
Field Card
Pre-wire reference for sauna and steam room control wiring, moisture-rated speaker rough-in, and lighting control conduit in wellness spaces.
Field Card
Quick-reference for in-ceiling speaker rough-in positions, wire sizing by run length, amplifier location, and zone count decisions.
05 · System Standards
Long-form field manuals for each technology system. Each covers infrastructure design, trade coordination, and commissioning requirements from pre-construction through sign-off.
Field Manual
Full technical standard for AI conference room infrastructure: codec selection, network architecture, display specifications, mic placement, and signal flow documentation.
Field Manual
Complete standard for door and gate automation: access control topology, gate operator sizing, intercom architecture, and trade coordination from trench through commissioning.
Field Manual
Full standard for energy monitoring and demand management infrastructure: sub-metering architecture, CT selection, communication bus topology, and automation integration.
Field Manual
Complete standard for motorized shading and facade automation: pocket dimensions by system type, motor wiring topology, exterior sensor network, and weatherproofing requirements.
Field Manual
Full standard for garage infrastructure and EV charging: dedicated circuit sizing, conduit routing, smart charger connectivity, and home automation integration.
Field Manual
Complete standard for outdoor AV and automation: speaker placement by zone, IP ratings, distributed audio wiring, lighting control, and conduit weatherproofing.
Field Manual
Full standard for pool and spa technology: underwater AV conduit, NEC bonding compliance, equipment room design, and control system integration.
Field Manual
Complete standard for wellness room technology: sauna and steam control wiring, moisture-rated hardware specifications, and ventilation integration.
Field Manual
Full standard for distributed audio infrastructure: speaker placement geometry, rough-in requirements, amplifier topology, and home automation integration.
06 · Pre-Wire Standards
Standards governing the specific pre-wire windows that occur before concrete, foam, tile, hardscape, and drywall are installed. Each covers the verification checklist and sign-off requirements for that phase.
Pre-Wire Standard
Amendment defining exact pre-wire requirements for lighting control keypads: box dimensions, conduit routing, mounting heights, and gang count.
Pre-Wire Standard
Standard governing pre-drywall audio inspection and sign-off: speaker box verification, wire pull confirmation, blocking inspection, and deviation log process.
Pre-Wire Standard
Standard governing low-voltage wiring protection before spray foam: conduit end sealing, wire bundle sleeving, and sign-off requirements.
Pre-Wire Standard
Standard for conduit placement before hardscape: burial depth, stub-up tolerances, conduit fill compliance, and sign-off before concrete or stone is placed.
Pre-Wire Standard
Standard for NEC 680 bonding of all AV and automation metallic components in pool and spa environments: conductor sizing, tie-in positions, and inspection sign-off.
Pre-Wire Standard
Standard for electrical power rough-in supporting AV systems: dedicated circuit requirements, outlet placement, conduit from panel, and electrical contractor coordination.
Pre-Wire Standard
Standard for equipment room rough-in for AI-capable automation: rack space allocation, conduit layout, power and cooling requirements, and network infrastructure.
Pre-Wire Standard
Standard for conduit placement before concrete slab pours: type selection, depth requirements, placement tolerances, end seal specs, and pour authorization sign-off.
Pre-Wire Standard
Standard for conduit placement during site trenching for gate operators: burial depth, sleeve requirements under driveways, and sign-off before backfill.
Pre-Wire Standard
Standard for low-voltage rough-in in wellness rooms before vapor barriers: conduit sealing, moisture-rated wiring, and coordination with tile and waterproofing trades.
For Architects, Builders, Electricians & Dealers
Every Restrepo project starts with the same documents. We share them publicly because the better the trade understands the spec, the cleaner the project finishes. Architects use them at design development. Builders use them at framing and rough. Electricians use them at panel and device coordination. Painters and finishers reference them at trim-out. Dealers in our network use them to specify their own projects.
If you are working a Restrepo project, these are the standards. If you are not yet, they are still yours to use. Reference them, share them, hand them to your team.
A note on use: these documents are watermarked because they are authored work. Use them, share them, print them, post them on a job-site wall. Do not rebrand them and do not resell them. If you want a private-label version of the standards for your own firm, reach out. that is a real conversation we have with partners.
Have a project that needs a spec review? Get in touch or book a 15-minute call.
Designing or building a luxury residence in NJ, CT, or NY? We engineer the systems and document the standards.
Start Your Project