What This Standard Covers
- Conduit-size quick reference table by cable type
- Box height and orientation cheat sheet
- Slack-loop minimums at every termination
- Top three coordination rules with framers and electricians
Who It Is For
- Framers and electricians who need a one-page reference at the wall
- Project managers walking the rough-in
- Subs who do not have time to read the full standard mid-job
When To Use It
- On the jobsite, mid-rough-in
- During quick coordination meetings with trades
- When the full standard is too much for a fast decision
Read or Download the PDF
The full standard, including diagrams, tolerance tables, and pass/fail photographic references, is in the embedded PDF below. You can read it inline or download it for your jobsite folder.
Field Notes
The full Rough-In Standards manual covers everything. This one-pager covers what you need at the wall, with a tape measure in your hand. Print it, laminate it, hand it to the sub at the start of the day. The full manual lives in the project folder for the calls where it matters.