Skip to main content

Field Manual

Panels Standards

How we install and label HomeWorks QSX, Crestron CLW, and shade-control panels. Enclosure placement, ventilation clearances, feeder coordination with the electrician, and the labeling protocol that lets any future technician walk into the closet and understand the system in five minutes.

What This Standard Covers

  • Panel enclosure placement and clearance standards
  • Ventilation and thermal management for closet and rack installations
  • Feeder and tap-circuit coordination with the electrical contractor
  • Internal labeling standards (load number, room, fixture, control address)
  • External labeling and as-built documentation requirements
  • Service access and door-swing requirements for code compliance

Who It Is For

  • Electricians installing or feeding a lighting or shade control panel
  • GCs framing the closet or chase that will house the panel
  • Future service technicians who need to find their way around
  • Owners or facility managers who will inherit the system

When To Use It

  • During panel-room layout and before the closet gets framed
  • During panel installation and termination
  • Before the sign-off walkthrough, to verify labeling
  • Anytime a service technician opens a panel for diagnostics

Read or Download the PDF

The full standard, including diagrams, tolerance tables, and pass/fail photographic references, is in the embedded PDF below. You can read it inline or download it for your jobsite folder.

Your browser does not display embedded PDFs. Download Panels Standards (PDF).

Field Notes

The panel closet is where a system either ages well or ages badly. A panel installed with good clearances, good ventilation, and clean labeling will run for twenty years and any competent integrator can service it. A panel jammed into a hot, undersized closet with no labels is a service nightmare on day one and a service disaster on day five thousand.

We label everything twice: at the breaker and at the load. We photograph every panel before the door closes. The as-built drawing matches what is actually in the closet. That is the standard.

Browse the Full Standards Library

Eighteen authored field manuals, one-pagers, and pre-wall standards. Free for trades, architects, and dealers across NJ, NY, and CT.

View All 18 PDFs