Skip to main content

Pre-Wire Standard

Pre-Drywall Audio Standard

The Restrepo standard governing the pre-drywall audio inspection and sign-off process. Defines the verification checklist for speaker boxes, wire pulls, blocking, and conduit before drywall installation begins.

What This Standard Covers

  • Speaker box placement verification against approved audio plan and architectural drawings
  • Wire pull confirmation by zone: home run continuity, labeling, and slack at termination
  • Blocking inspection requirements for in-ceiling and in-wall speaker positions
  • Conduit integrity check from speaker locations back to equipment room
  • Field change log documentation process for deviations from the approved plan
  • Sign-off authority and required parties before the pre-drywall inspection is closed

Who It Is For

  • AV project managers conducting pre-drywall inspections on active job sites
  • General contractors scheduling and coordinating the pre-drywall sign-off process
  • Architects or owners representatives verifying AV scope before the inspection window closes
  • Low-voltage technicians preparing their rough-in for pre-drywall review

When To Use It

  • After all low-voltage rough-in is complete and before any drywall board is hung
  • At the pre-drywall inspection meeting with the GC, AV tech, and other relevant trades
  • When any field deviation from the audio plan requires documentation and approval
  • Before framing inspection is closed if AV rough-in is part of the inspection scope

Read or Download the PDF

The full standard, including specifications, diagrams, and field references, is in the embedded PDF below. Read it inline or download it for your jobsite folder.

Your browser does not display embedded PDFs. Download Pre-Drywall Audio Standard (PDF).

Field Notes

The pre-drywall window is the last point at which every audio rough-in decision can be verified and corrected without a change order. Missing a speaker location or a wire pull after drywall means cutting and patching. This standard defines what has to be confirmed before that window closes.

The sign-off requirement is not bureaucratic. It is protection for the GC, the AV tech, and the client. When there is a dispute later about whether a speaker location was approved, the pre-drywall sign-off log settles it. We require it on every project.

Browse the Full Standards Library

Forty-six authored field manuals, one-pagers, and pre-wall standards. Free for trades, architects, and dealers across NJ, NY, and CT.

View All 46 PDFs