Pre-Wire Standard

Pre-Slab Conduit Standard

The Restrepo standard for conduit placement before concrete slab pours. Covers conduit type and sizing by cable fill, placement tolerances, depth requirements, end seal specifications, and the sign-off protocol before concrete is placed.

What This Standard Covers

  • Conduit type selection by cable type, fill requirement, and environment below slab
  • Burial depth and cover requirements for conduit under slabs by application
  • Placement tolerance limits relative to approved drawings for each conduit stub-up position
  • End seal and pull string requirements for all conduit before concrete is placed
  • Conduit fill compliance verification before form is closed
  • Inspection checklist and required sign-off parties before concrete pour is authorized

Who It Is For

  • Concrete contractors who need conduit placed before slab forms are set and poured
  • General contractors managing pre-slab rough-in coordination between trades
  • AV and low-voltage technicians placing conduit during the slab rough-in phase
  • Architects confirming conduit layout in slab drawings before construction documents are issued

When To Use It

  • Before slab forms are set to confirm conduit routing and stub-up positions
  • After conduit placement but before concrete pour for inspection and sign-off
  • When changes to slab conduit layout are required after initial placement
  • At slab pour inspection as part of the overall rough-in verification sequence

Read or Download the PDF

The full standard, including specifications, diagrams, and field references, is in the embedded PDF below. Read it inline or download it for your jobsite folder.

Your browser does not display embedded PDFs. Download Pre-Slab Conduit Standard (PDF).

Field Notes

Concrete is not forgiving. Conduit under a slab has to be right before the pour. A stub-up that is six inches from where the drawing shows it, or a conduit that was not placed at all, becomes a core-drill job in finished concrete. This standard defines the verification steps that prevent those situations.

The pre-slab window is also when future-use conduit for outdoor zones should be placed. Running a spare sleeve under the slab to the terrace or pool equipment room at rough-in costs almost nothing. Adding it after the slab is poured is a significant job. We document the future-use conduit requirements in this standard.